Home / Services / Fire Protection
A60 / A30SOLAS / IMOClass-Approved

Fire Protection
(A60 / A30)

Certified Passive Fire Protection: Where Failure Is Not an Option

Supply and installation of certified A60 and A30 fire insulation systems for bulkheads, decks and penetrations across offshore platforms, FPSOs, tankers and newbuilds, fully compliant with all major classification societies.

A60 / A30rating
Survey → Installfull scope
ABS·DNV·LR·BVapproved
Zerocompromise
What We Deliver

Type-approved fire integrity.

Certified passive fire protection, documented for class submission from survey through to sign-off.

At a glance

RatingA60 / A30
VesselsOffshore · FPSO · Tanker · Newbuild
ScopeSurvey → Supply → Install
TestingStructurally fire-tested
ApprovalsABS · DNV · LR · BV
DocumentationPrepared for class submission
Scope & applications
A60 InsulationA30 InsulationBulkheads & DecksPenetrationsNewbuild & Conversion
Standards & approvals
ABSDNVLloyd's RegisterBureau VeritasSOLAS / IMO
Why type-approval matters. From initial survey through completed installation, we work closely with shipyards and operators to deliver on-time, fully compliant fire protection. Every system is type-approved, structurally fire-tested and documented for class submission, with zero compromise on integrity.
Capabilities

Survey, supply, install.

A single accountable partner across the full fire-protection scope.

01

Survey & Assessment

We survey the structure and define the A60/A30 scope against the vessel’s fire plan and classification-society requirements.

02

Type-Approved Supply

Certified A60 and A30 insulation systems for bulkheads, decks and penetrations, structurally fire-tested and fully documented.

03

Installation & Sign-off

On-site installation alongside shipyards and operators, completed to schedule with class-society sign-off.

How We Work

From enquiry to sign-off.

One accountable point of contact, from first brief to class-approved delivery.

01 · Enquiry

Brief & Scope

Tell us your vessel type, application and classification-society requirements.

02 · Assessment

Technical Review

Our engineers assess compliance, certifications and optimal system selection.

03 · Proposal

Specification & Quote

A detailed technical proposal with full certification documentation and lead times.

04 · Delivery

Supply & Installation

On-time delivery with on-site supervision and class-society sign-off.